Pages :   1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125   Previous  Next Page

Note ID: MS257
Weather Conditions: Partly cloudy, high 70s
Report Author: Mary Harding Sadler
Report Date: 6/11/1999
Location: Mansion - Second Floor - Above Ballrooms
Work Type: New Masonry Construction
Notes: Modification of masonry openings along the east wall above the Ballrooms continues. The central opening was narrowed with concrete block. The jambs of new and modified openings were repaired with Portland cement mortar.


No image available


Note ID: MS262
Weather Conditions: Partly cloudy, high 70s
Report Author: Mary Harding Sadler
Report Date: 6/11/1999
Location: Mansion - Second Floor - Bath #1 (E/R)
Work Type: Demolition
Notes: More material is removed from this former kitchenette/ future bathroom exposing clues (dropped ceilings, wall finishes) about the evolution of this area in the 20th century.


No image available


Note ID: MS261
Weather Conditions: Partly cloudy, high 70s
Report Author: Mary Harding Sadler
Report Date: 6/11/1999
Location: Mansion - Second Floor - Bedroom and Bathroom #2 (R)
Work Type: Demolition
Notes: Over the former elevator shaft, the modified framing is irregular and, perhaps, hastily conceived by those who installed the former elevator.


No image available


Note ID: MS256
Weather Conditions: Partly cloudy, high 70s
Report Author: Mary Harding Sadler
Report Date: 6/11/1999
Location: Mansion - Second Floor - Capitol Room (E/R)
Work Type: Framing
Notes: A supply delivery truck lifted huge floor framing members through the central window in the Capitol Room. The materials will be installed as floor framing for the Governor's Bedroom.


No image available


Note ID: MS260
Weather Conditions: Partly cloudy, high 70s
Report Author: Mary Harding Sadler
Report Date: 6/11/1999
Location: Mansion - Second Floor - Dressing Room and Bedroom (E) / Governor's Bedroom (R)
Work Type: Demolition
Notes: The removal of a majority of finishes from the west wall of the Governor's Bedroom and Dressing Room area has revealed portions of the original east (rear) wall of the Mansion. New openings and modified openings have been partially repaired. New steel lintels have been installed.


No image available


Note ID: MS263
Weather Conditions: Partly cloudy, high 70s
Report Author: Mary Harding Sadler
Report Date: 6/11/1999
Location: Mansion - Second Floor - Private Dining Room, Bathroom, and Powder Room (E) / Bedroom and Bathroom #3 (R)
Work Type: Demolition
Notes: In the east wall of this area, once the First Family's private dining room (plus powder room), the openings are modified and repairs made with Portland cement. New mechanical ductwork appears in the ceiling.


No image available


Note ID: MS285
Weather Conditions: Partly cloudy, low 90s
Report Author: Mary Harding Sadler
Report Date: 6/14/1999
Location: Mansion - Basement - Beneath Ballrooms
Work Type: Framing
Notes: The basement area beneath the North and South Ballrooms is framed in.


Governor's Mansion Renovation Photograph  Governor's Mansion Renovation Photograph  


Note ID: MS278
Weather Conditions: Partly cloudy, low 90s
Report Author: Mary Harding Sadler
Report Date: 6/14/1999
Location: Mansion - Basement - Coat Room (E) / Reception (R)
Work Type: Miscellaneous
Notes: Many utilities are being installed in a north-south axis through the suite of spaces including the Mansion Director, Reception, and Security areas. Installation has just begun.


Governor's Mansion Renovation Photograph  


Note ID: MS282
Weather Conditions: Partly cloudy, low 90s
Report Author: Mary Harding Sadler
Report Date: 6/14/1999
Location: Mansion - Basement - General
Work Type: Framing
Notes: All perimeter and interior brick walls in the basement basement are being furred out with steel studs. All new interior partitions are wood frame.


Governor's Mansion Renovation Photograph  Governor's Mansion Renovation Photograph  


Note ID: MS281
Weather Conditions: Partly cloudy, low 90s
Report Author: Mary Harding Sadler
Report Date: 6/14/1999
Location: Mansion - Basement - Hall (E) / Stairhall (R)
Work Type: Framing
Notes: The basement framing in the Stairhall is a combination of steel studs, furring channels, and wood partition framing. All existing window and door casings and framing are removed from openings to provide the best substrate for new finishes.


Governor's Mansion Renovation Photograph  

Pages :   1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125   Previous  Next Page